Launch of the “Krabbe”

After a build time of approximately one year, the floating grab dredger “Krabbe” was ceremoniously launched at the Genthin shipyard.

It was ordered by the Agency for Mechanical Engineering South-West (Fachstelle Maschinenwesen Südwest) at the Koblenz Waterways and Shipping Office (WSA).

A news report can be found in the magazine “Binnenschifffahrt”:

PDF to the article of the „Krabbe“- launch